Wednesday, July 9, 2025
spot_img

Tallest Rail Bridge Launch & Vande Bharat on 19th

On January 25, the train’s testing run on the Katra–Srinagar route was completed successfully. The train departed Katra at 8 a.m. and arrived in Srinagar, Kashmir’s final station, at 11 a.m.

On April 19, Prime Minister Narendra Modi is scheduled to travel to Jammu & Kashmir. He will first officially open the Chenab Bridge, the tallest railway bridge in the world, at Udhampur. He would depart on the Jammu-Srinagar Vande Bharat Express train after arriving at Katra (Mata Vaishno Devi).

According to Union Minister Jitendra Singh, the train service is being temporarily resumed from Katra because repairs are currently being made at the Jammu railway station. Once the repairs are finished, the train will begin service from Jammu in August. Almost 250 kilometers separate Jammu and Srinagar.

Katra-Srinagar route underwent a successful trial

On January 25, the Katra-Srinagar route underwent a successful trial. At 8 a.m., the train departed Katra and arrived in Srinagar at 11 a.m. In three hours, the train traveled 160 kilometers.

There are anti-freezing features on this Vande Bharat. Anti-freezing elements are a distinctive feature of the Jammu-Srinagar Vande Bharat train. Trains on this vital line will operate day and night all year round thanks to the snow-clearing train that runs ahead of passenger and freight trains.

Water tanks and bio-toilets won’t freeze thanks to the train’s heating system. Even in below-freezing temperatures, the driver’s windshield and air brakes will function. This will guarantee connectivity between the two locations under any weather conditions. Because the region is located in Zone-V for earthquakes, the railways have employed vibration-resistant seismic equipment in this project.

Five images of the Vande Bharat train between Katra and Srinagar

‘Bharat Mata Ki Jai’ was yelled by the crowd when the Vande Bharat train arrived at Jammu Tawi station on January 25. In addition to this, they photographed the train.

The train has been updated with numerous new features.

Additionally, heaters have been added to the train’s restrooms.

Additionally, Vande Bharat’s driver cabin has been upgraded.

The train’s water tank now has silicon heating pads fitted.

Read More: Most Dangerous Stone? How Stones Form in the Body

 Join Our Group For All Information And Update, Also Follow me For Latest Information
 Facebook Page                 Click Here
 Twitter                              Click Here
 Instagram                 Click Here


spot_img
RELATED ARTICLES

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Most Popular

Latest

UP Bridge Corp: Engineers Hired via GATE

Recruitment for the position of Assistant Engineer has been declared by Uttar Pradesh State Bridge Corporation Limited. Candidates can visit the official website to...

iPhone 17 Pro Design: Major Changes Expected

Apple is getting ready to release its next generation of iPhones. Reports indicate that the iPhone 17 Pro model may see a modification in...

Documents Needed for CSPGCL Apprentice 2025 Application

Candidates for CSPGCL's Graduate Apprentice and Diploma Apprentice programs have received notifications. You can apply offline for this vacancy if you would like to...

Meet the Amalfi, Ferrari’s most reasonably priced vehicle.

Ferrari has revealed the Roma replacement. The Amalfi, which will replace the Roma, has been unveiled by Ferrari. Even though it still shares the same...

Car Safety Tip: Engine Locking Feature Prevents Vehicle Theft

Engine Locking System: This system prevents your automobile from being stolen by preventing the engine from starting until the right key is found. Let's...

Most Popular